Running a one-hour risk workshop at the start of a project
Run a one-hour construction risk identification workshop that turns your team's experience into a ranked list of risks, each with an owner and a date.
Trouble on a construction project rarely surprises everyone: someone saw the first sign. These lessons cover naming risks at the start, preparing for the activities that cannot slip, reading the early warnings, deciding without every fact, and solving problems so they stay solved.

Run a one-hour construction risk identification workshop that turns your team's experience into a ranked list of risks, each with an owner and a date.

Write a one-page construction contingency plan for a lift, pour or shutdown: the trigger, the decision time, the backup already booked and who decides.

Make a construction site decision under uncertainty: split what you know from what you assume, choose the option you can undo, and record why.

Use A3 problem solving on one page — current state, cause, countermeasure and check — to stop a site problem that keeps coming back, such as a hoist queue.

Run a simple schedule risk analysis: delay each uncertain activity in a copy of the schedule, see what moves the finish, and protect the few that matter.

Find the single points of failure on a construction project — the one person, supplier or machine nobody can replace quickly — and put a backup behind each.

Keep a project assumptions log: write down what the schedule and budget take as true, give each a check date and an owner, and act when one fails.

Set up construction permit tracking: one list of every permit, condition and inspection, with the date each is needed and who books it, so nothing stops work.

Plan a project handover when an employee leaves mid-job: name the cover, capture open items, verbal agreements and contacts, and move every role and key.

Spot the warning signs of subcontractor financial trouble, from shrinking crews to unpaid suppliers, and protect the job while staying within the subcontract.

Check five signs of a troubled construction project every week, from plan reliability and RFI age to crews and repeat defects, before the cost report shows it.

Collect, check and track every subcontractor's certificate of insurance and workers' compensation clearance, so no trade works on site while uncovered.

Build a construction site emergency contact list and an after-hours plan for floods, break-ins, alarms and storms, and test it before the night you need it.

Set an escalation matrix for a construction project: the cost, time, safety and contract limits that decide which problems go up, to whom and how fast.

Prevent construction site theft with deliveries timed for installation, locked storage, marked and recorded tools, and the same closing routine every night.

Walk the authorized site route before mobilization, separate observations from assumptions, and give each unresolved condition an owner and a need date.

Compare sensitive phases with historical climate context, assess feasible responses, and record the monitoring triggers that turn an allowance into a decision.

Connect excavation scope to all relevant owner responses, check their limits and validity, and resolve unknown services before the responsible site release.

Compare trade commitments with the project's required skills and dates, distinguish evidence from assumptions, and set early response owners and triggers.

Map unresolved design information by package, derive need dates from actual dependencies, and obtain owned responses before assumptions become installed work.

Define what a risk owner watches, prepares and escalates, then hand over the evidence, authority limits and next commitments when ownership changes.

Use a short weekly risk item to expose changed triggers, new uncertainties and decisions due, with owners and follow-up rather than reading the register aloud.

State the risks and assumptions behind a schedule time reserve, agree how its use is recorded, and review the remaining allowance beside current dependencies.

Build an accessible policy-and-contact map for site reporting, identify unanswered insurance questions, and route a loss without promising coverage or payment.

After damage, follow the safe response and actual notification route, retain factual records and tracked costs, and obtain direction before repair or disposal.

Gather the actual bond, subcontract and performance records, identify notice and decision questions, and route a failing trade's situation to authorized review.

Connect environmental controls to the site plan, inspection owners and safe response contacts, with immediate reporting duties and unresolved conditions clear.

Start with a specific recurring problem, test each explanation against evidence, follow separate cause paths and check whether the chosen countermeasure helps.

Write the observed problem with its location, period, measure and comparison, then confirm evidence limits with the people involved before analysing the cause.

Trace a slipped milestone through dated events, dependencies and evidence gaps, then assess recovery options without deciding liability from chronology.

Pull relevant site records against a specific decision, check their units and boundaries, and identify missing evidence before committing people or money.

Compare an event's intended and actual sequence, examine supported differences, and hand assessed changes into the next plan with owners and result checks.

Draw a recurring decision around authority and evidence, include an unknown-condition route, and test past cases without treating agreement as validation.

Present the problem, assessed options, assumptions and needed decision on one page, then confirm the actual authority, received answer and remaining conditions.

Use repeated plan changes and unresolved constraints to trigger a phase review, then issue received commitments separately from proposals and pending releases.
Procurement and logistics
A simple risk register for construction projectsCost control
Managing contingency without spending it earlyProcurement and logistics
Recovering from a disruption: the first 48 hoursProcurement and logistics
When a supplier fails: recovering from a late or wrong delivery