Mobile equipment under Part 16: operator training, the machine and the people around it
A telehandler delivers equipment around a landfill gas plant. During the operator’s break, a labourer takes the controls because the next pallet is holding up a delivery. The superintendent discovers that nobody has checked his training for this machine.

Check the person, the machine and the surrounding work together. Part16 requires pre-shift inspection and defect reporting, restricts riders, addresses seat belts and pedestrian protection, and requires records of maintenance affecting safe performance. Lift trucks have additional training and machine provisions in16.43. The regulator’s public training page distinguishes required training from a universal forklift certification requirement. This lesson gives a readiness review, not operator training or the contents of the referenced standards.
Check the requirement against the actual work
- Identify the machine and its actual use. Record the model, attachment, rental or fleet number and planned task. A familiar-looking machine can have different controls and limits. Ask the responsible employer to identify the applicable instructions and provisions, including any lift-truck or other specific requirements. Keep a change of attachment or task visible rather than carrying forward the previous equipment check.
- Check training before allocating the controls. Ask for the actual operator-training evidence and the employer’s assessment for the proposed equipment and work. Establish who can provide additional instruction and supervision. Do not substitute the worker’s confidence, a driver’s licence or experience with another machine for that review. A short staffing gap is a scheduling problem to resolve without inventing an operator qualification.
- Read the condition record with the operator. Locate the pre-operational check, any reported defect and the responsible response. Match the record to the machine currently on site. Ask which maintenance or repair information affects its safe use, and whether it is available. A rental-company delivery slip identifies a transaction; it does not explain an unresolved fault or establish that today’s check occurred.
- Walk the surrounding work. Compare the planned route with the current pedestrian access, unloading location and other trades. Ask how the chosen arrangement protects people where visibility is restricted. Agree who communicates a route change and where work pauses while the arrangement is reconsidered. Do not prescribe a universal spotter layout or treat a reversing alarm as the entire pedestrian plan.
- Make substitutions a fresh decision. Keep the accepted operator, machine and work arrangement together in the dispatch record. Name the person handling an absence, defect or changed delivery. Brief affected crews on the resulting instructions. Close a pending item only after receiving the actual evidence or correction; a tick beside “operator available” hides the question of which operator and which task.
Common mistakes
- Assuming every equipment ticket covers every machine.
- Reading the inspection sheet for a different fleet number.
- Allowing the break schedule to decide who operates.
Checklist
Before accepting the equipment assignment
- Specific machine, attachment and planned task.
- Actual training evidence reviewed by the employer.
- Current condition record and unresolved defects.
- Pedestrian arrangement for the real work area.
- Named response to substitutions and changes.
Check your understanding
The worker has used a smaller forklift for years. Is that enough for today’s telehandler assignment?