BC excavation documents: match written instructions to the actual conditions
A watermain crew receives a trench drawing for one street section. The next section has different ground and an adjacent structure. The superintendent needs the actual instructions and their limits checked before treating the earlier drawing as permission to continue.

Connect the excavation with the applicable Part 20 requirements and current written instructions. Guideline G20.78 explains the professional-instruction requirement and its supporting information: identified location, ground conditions, protection, equipment limits and changes. Instructions for supporting an adjacent structure require the appropriate engineering involvement. A drawing for different conditions cannot settle this location.
Give the excavation instructions a location and receiving check
- Identify the area and intended work. Mark the actual street section, proposed task and relevant project references from a suitable safe setting. Give the responsible review the information needed about current surroundings and interfaces. Keep uncertainty visible rather than selecting a soil description from appearance. A delivery date or pressure to reach the pipe cannot resolve the conditions governing entry or the chosen protection.
- Receive the applicable requirements and instruction scope. Have the responsible people identify the current provisions and which qualified professional involvement this excavation requires. Check who prepared the received document and what work it covers. Record unresolved questions before the affected work. Do not turn a remembered depth or neighbouring contractor’s arrangement into permission for this location; applicable requirements and the professional’s actual assessment govern.
- Connect the document to the workface. Keep its revision, location and stated conditions traceable to the crew’s current references. Identify who explains the arrangement and conducts the required receiving checks. Resolve missing or contradictory information through the proper route. The drawing file’s existence cannot establish that the installed protection, available access or work conditions meet the actual instructions and other applicable requirements.
- Return changes before extending the earlier decision. Record the changed location or condition and obtain its responsible assessment and revised instructions where required. Communicate the current permitted arrangement and unresolved limits to affected workers. Keep an earlier version for the history without letting it remain the workface reference. Review later deliveries or adjacent activity when they affect the basis on which the arrangement was established.
Common mistakes
- Extending one location’s drawing to different conditions.
- Classifying unfamiliar ground from appearance.
- Treating a saved drawing as an installed-condition check.
- Leaving an old instruction at the workface after a change.
Checklist
The excavation file connects
- Actual location, task and current references.
- Applicable requirements and responsible qualified review.
- Received instruction scope and revision.
- Workface explanation, required checks and open limits.
- Changed-condition response and current crew information.
Check your understanding
The trench drawing is current, but its stated ground conditions do not match the next section. Is the revision date enough?