Visitors on site: receive the actual purpose, route, briefing and supervision
A consultant arrives at a water-treatment upgrade and heads toward the trailer through the delivery area. She knows the project well, but the access route changed yesterday. The coordinator needs to receive this visit against today's conditions without turning a familiar name or loaner vest into permission to enter.

Match visitor arrangements to the actual visit and exposure. The UK's HSE describes proportionate visitor induction, with escorted visitors informed about the hazards and controls relevant to them. That is a useful educational principle, not a Canadian entry rule. Apply the local requirements and site's authorized arrangements.
Receive the visit before it enters affected work
- Clarify the purpose and receiving person. Establish who is arriving, what they intend to do, where they need to go and who is responsible for receiving them. Check current entry requirements and permitted areas with the authorized site lead. An inspector's lawful access needs appropriate cooperation and hazard information, not an improvised rule intended to obstruct an inspection.
- Arrange a current route and suitable visit. Confirm the proposed area and route against today's actual work and protections. Receive any needed coordination with active trades or vehicle operations before access. Do not ask an escort to lead somebody through an unresolved work area simply because a tour is already on the calendar.
- Give the relevant briefing and equipment arrangement. Explain applicable restrictions, emergency information, contact and route in terms the visitor can use. Check understanding and arrange the actual assessed protective-equipment requirements, including fit and instruction where needed. Keep any required training or specialist competency separate. A borrowed hard hat or vest cannot make an unsuitable route acceptable or authorize a visitor to operate equipment.
- Keep the visit received through departure. Use the site's required presence record and capable escort or supervision arrangement. Confirm who receives the visitor if the host changes; return a proposed detour or new activity for appropriate review. Record departure through the actual process. A sign-in entry supports knowing who arrived, but it does not establish current location, competent supervision or safety throughout the visit.
Common mistakes
- Using a familiar visitor's name instead of checking today's access.
- Treating loaner equipment as permission for an unresolved route.
- Letting an escort inherit a visit without a clear handover.
- Applying a private gate rule as an excuse to obstruct lawful inspection.
Checklist
A received visitor arrangement shows
- Actual purpose, authorized receiving person and permitted areas.
- Current route and work-interface coordination.
- Relevant understandable briefing and assessed equipment needs.
- Capable escort or supervision and changes returned for review.
- Required presence and departure records, with no automatic clearance claim.
Check your understanding
The consultant signed in for a trailer meeting and now wants to walk into active work. Does the signature cover it?