Arriving-crew orientation: current site information, individual receipt and training gaps
An experienced glazing crew arrives while a transit station's access and muster arrangements are changing. Their trade experience does not tell them which gate is available or how this site's response works. The foreman's signature alone cannot show that each worker received the current information.

Prepare the arriving crew for this site and their actual assignment, using its current orientation and training requirements. CCOHS's sample checklist calls for workplace-specific adaptation and records; it is not an exhaustive legal checklist. Keep prior trade experience distinct from site knowledge. Twenty minutes, one handout or a group signature cannot establish that every worker has the necessary information, training and understanding.
Receive the people, current location and training needs
- Prepare the current site information. Check approved access, active restrictions, work locations, relevant hazards and emergency arrangements with their responsible owners. Include actual reporting and supervisory contacts. Resolve inconsistent map or sign information before relying on it. Do not orient from a familiar old gate plan when an equipment operation has changed the receiving route.
- Confirm each worker's actual assignment. Identify participants, their expected work and task-specific training or support still needed through the appropriate process. Use suitable language and communication arrangements. An experienced installer may still need instruction for this equipment or location; a crew leader's assurance is not the whole record of individual orientation or competence.
- Check practical understanding appropriately. Explain current routes and contacts from a suitable safe setting, with a controlled tour where appropriate. Ask workers to describe how they find the permitted area, obtain first aid and report a concern under the actual arrangements. Correct unanswered points and provide required training before affected work. Do not shorten the session to meet a fixed twenty-minute target.
- Retain receipt and later updates. Record what each person received, when, the current references and outstanding training or restrictions through the approved system. Give usable accessible information and identify the update route. Confirm later changes reach affected workers. Keep orientation evidence separate from equipment authorization, task release or a claim that no unfamiliar hazard remains anywhere on site.
Common mistakes
- Using an old map for a changed access arrangement.
- Treating trade experience as complete site knowledge.
- Accepting one signature as everyone's receiving evidence.
- Calling orientation a complete task authorization.
Checklist
The arriving-crew record shows
- Current approved site references and contacts.
- Actual workers, assignment and training needs.
- Suitable information and checked understanding.
- Individual receipt and unresolved restrictions.
- A received update route and separate task status.
Check your understanding
The foreman signed the sheet, but a worker cannot identify the current permitted gate. Is orientation complete?



