PPE checks at the start of shift: what to look at and when to pull a piece from service
The crew's usual protective equipment is ready, but today's repair has different hazards. One worker also notices damage on an item previously accepted. The start check needs the actual task and product criteria, with a replacement route, rather than a one-minute glance or a remembered service-life rule.

Connect the required protection to the assessed task and inspect it under the actual manufacturer's and workplace criteria. CCOHS's PPE-program guidance links selection, fit, maintenance, training and replacement; PPE does not eliminate the hazard itself. A generic check cannot select every glove or certify all protection. Keep other controls in place and obtain the appropriate response before affected work relies on unsuitable equipment.
Check the protection, condition and real replacement route
- Confirm what today's work requires. Review current hazards, assessed controls and the relevant PPE program with the responsible supervisor or safety person. Match the actual product to its required protection, certification and use conditions. Ask about an unfamiliar or changed task. The gear used yesterday is not automatically suitable for today's chemical, impact or noise exposure.
- Inspect using the product's actual criteria. Follow its required pre-use and other checks, examining the relevant components and condition from a suitable safe setting. Record damage, missing parts or uncertain history through the approved process. Keep retirement, repair and service-life decisions with the actual criteria. Do not decide that every faded shell must be discarded or every unmarked item is sound from appearance alone.
- Confirm fit, compatibility and user knowledge. Check that the actual wearer has appropriate fit and instruction, and that combinations do not impair the intended protection. Route a fit or unfamiliar-use issue for proper support. A stock label and signature cannot establish a suitable wearing arrangement. Specialized equipment, including respiratory and fall protection, retains its own selection, inspection and training requirements.
- Resolve the concern before relying on the item. Follow the actual removal, assessment or replacement process for suspect protection and prevent accidental reuse where required. Obtain a suitable replacement with necessary instruction and fit. Keep the affected assignment under its real controls if replacement is unavailable. Record recurring supply or condition gaps; an order placed this morning does not make missing protection available now.
Common mistakes
- Assuming yesterday's gear fits today's hazards.
- Inventing retirement criteria from appearance or a remembered age.
- Ignoring fit or interference between protective items.
- Treating an ordered replacement as available protection.
Checklist
The actual PPE check retains
- Assessed task needs and other required controls.
- Current product criteria and relevant condition history.
- Appropriate fit, compatibility and instruction.
- A received defect response and suitable replacement.
- Affected-work status and recurring supply follow-up.
Check your understanding
A replacement is ordered, but the required suitable item is not available. Can the order number close the concern?