Hand-arm vibration: record actual tool use and receive the exposure-control decision
A parkade repair uses hand-held breakers throughout the week. The foreman has a list of rented tools but no account of their actual use. One worker reports tingling fingers. Splitting tomorrow's shift between more people cannot by itself establish an appropriate exposure arrangement.

Separate the work record from the exposure decision. CCOHS describes vibration-related hand symptoms and factors including vibration intensity, duration, tool condition, grip and work practices. Symptoms also need appropriate health assessment; white fingers alone do not identify one diagnosis. The site's competent process and applicable requirements establish controls. This lesson supplies no vibration calculation, maximum trigger time or rotation formula.
Make the breaker record useful to the responsible assessment
- Describe the actual operation. Identify the task, location, exact equipment and accessories, relevant instructions and condition concerns. Give the competent reviewer available manufacturer information with its stated basis. Do not rank unlike tools from an unexplained number or treat the largest published value as a complete assessment of actual use. Keep uncertainties beside the information rather than hide them.
- Record use as it happens. Follow the agreed recording approach for actual tool-use periods and relevant work circumstances. Distinguish observed use from the booked shift; waiting, setting out and another operation are different entries. Where information is missing, say so. A recollection that everyone had a full day cannot tell the reviewer each person's actual tool exposure.
- Receive and implement the control decision. Have the responsible competent team determine the suitable method, equipment, maintenance and work arrangements. Check that instructed limits and resources reach the crew. If the plan changes, return it for review. Adding another operator or buying a different glove is not an automatic solution, and a proposed alternate task needs its own suitable arrangements.
- Respond to a worker's concern promptly. Receive a report of tingling, numbness or finger-colour change respectfully through the site's health and safety process. Obtain appropriate medical assessment and the necessary current-work response. Do not diagnose the worker, demand a demonstration with the tool or send them back while treating the report as ordinary tiredness. Keep private health information with its proper receivers.
Common mistakes
- Using booked shift length as actual trigger time.
- Comparing manufacturer values without their information limits.
- Assuming rotation automatically controls exposure.
- Dismissing symptoms or making a workplace diagnosis.
Checklist
The vibration-review handoff includes
- Identified task, equipment and relevant condition concerns.
- Actual use information with its recording limits.
- Competent assessment and received controls.
- Crew instructions, implementation and change receiver.
- Prompt health response to reported symptoms.
Check your understanding
You can split the breaker work across four people, but the actual use and assessment are missing. Is the rotation ready?