On Monday morning the superintendent walks level 2 and finds boot prints across the new hardwood, a pallet-jack gouge in the corridor and a scissor lift parked on finished tile. The insulation delivered on Friday sat uncovered through a wet weekend. Nobody did any of it on purpose, and nobody was responsible for protection.

A long corridor in a converted industrial building, its floor covered wall to wall in blue temporary protection with a yellow line.
Photo: Tommy Bond on Unsplash

Damage to finished work and stored materials is rarely one event; it is many small ones that nobody owns. Your specification may say who protects what — Canada's National Master Specification, for example, has a Division 01 section called Protecting Installed Construction — but protection only happens when someone plans it, installs it and checks it. Storage is also a safety matter, because stacked material has to stay put and floors have limits.

  1. List what needs protecting, and from what: finished floors, doors, glazing, stairs, equipment and stored materials, against water, sun, frost, dust, traffic, theft and other trades.
  2. Match protection to the hazard: board on finished floors along traffic routes, corner guards and door covers, film on glazing, raised and covered storage for materials that must stay dry, and locked storage for tools and valuable stock.
  3. Store to the manufacturer's instructions and the rules: off the ground, covered and stacked stable. British Columbia requires material to be placed, stacked or stored in a stable and secure manner, and US federal rules also require clear aisles and stored loads within each floor's maximum safe load.
  4. Check capacity before stocking a floor: in British Columbia, workers delivering materials to a temporary floor or decking must be aware of its safe carrying capacity and how to prevent overloading. Ask the engineer where heavy loads may go.
  5. Name who installs, maintains and removes each kind of protection, in the trade scopes or the coordination minutes.
  6. Inspect weekly and after bad weather, repair torn covers the same day, and photograph an area's condition before the next trade takes it over.

Common mistakes

  • Laying stored material on a tarp on the ground, where water pools and wicks up.
  • Installing protection and never maintaining it.
  • Stocking a whole floor's drywall in one bay.
  • Lifting protection for an owner's walk and not putting it back.

Checklist

The weekly protection walk

  • Floor, door and glazing protection intact on traffic routes
  • Stored materials raised, covered and stable
  • Floor and deck loads within what the engineer allows
  • Aisles and exits clear
  • Tools and valuable stock locked away
  • Areas changing hands walked and photographed

Check your understanding

Two trades each say the other damaged a finished wall. What record would have settled it?

Show the answer
A dated handover of the area: a short walk with photos when the wall was finished, and again when the next trade moved in. With the condition recorded at each change, the damage falls inside one trade's time in the area, and the conversation turns to the repair instead of the blame. The same record supports a fair back charge if one is needed.

Sources

  1. NMS table of contents (Division 01: 01 76 00 Protecting Installed Construction)National Research Council Canada · accessed
  2. OHS Regulation Part 4: General Conditions (section 4.43, Stacking materials)WorkSafeBC · British Columbia, Canada · accessed
  3. OHS Regulation Part 20: Construction, Excavation and Demolition (section 20.6, Design loads)WorkSafeBC · British Columbia, Canada · accessed
  4. 29 CFR 1926.250 General requirements for storageElectronic Code of Federal Regulations (eCFR) · United States (federal OSHA; state plans may differ) · accessed
  • Looking straight down on a mid-rise building site: a tower crane, a reinforced deck ready for concrete, stored materials and the street beside it.

    Procurement and logistics

    A one-page site logistics plan

    Draw a one-page site logistics plan that shows access, laydown, hoisting, facilities and fire access, and keep it current as the job moves through phases.

    3 min read

  • A building under construction sits inside a full scaffold with a temporary roof, its base wrapped in tarps, on snowy ground.

    Procurement and logistics

    Planning for winter work

    Plan the schedule, enclosures, heat, materials and crew welfare that winter construction needs, and check your local rules on cold, heaters and concrete.

    3 min read