Regular workplace inspections: what Part 3 expects of the employer's own inspections
A bus-depot coordinator can produce many site-walk photos but cannot show which conditions were inspected, what was found or whether the required corrections happened. The pictures record visits, not a complete inspection process.

Plan inspections to prevent unsafe conditions from developing. WorkSafeBC explains that frequency depends on the work, risk and changing conditions; there is no universal weekly schedule for every workplace. Regular inspections and special inspections after malfunction or accident serve different needs, and particular equipment or work can have additional requirements. Appropriate committee or worker-representative participation is required where feasible. Read the applicable provisions and guidance before treating a general progress walk as the whole inspection arrangement.
Make the required inspection and response traceable
- Define the areas and work to be checked. Identify workplaces, activities, equipment and shifts within the employer’s inspection arrangements. Establish the relevant task-specific requirements and how changes reach the inspection plan. Ask what can change between scheduled visits and what requires an earlier or special check. A calendar entry says when a visit is planned; it cannot prove that the chosen interval is adequate for the actual risks.
- Receive suitable participation and preparation. Identify the people conducting the inspection, their relevant familiarity and training, and the applicable worker-participation arrangements. Resolve absent or uncertain representation through the proper route. Use current task and area information so the team can examine the actual conditions. Do not ask an unqualified person to determine a technical condition merely because that person owns the checklist or has attended earlier site walks.
- Record findings with enough context to act. Describe the location, observed condition, affected work and time, separating observation from assumptions about cause. Use permitted photos to support the written finding without exposing people to obtain a better image. Connect the report to the appropriate immediate response where required. A file of general views cannot replace identifying the condition, and documenting an unsafe condition does not itself control it.
- Follow the response to its actual result. Identify the responsible receiving person, needed action and follow-up evidence through the company’s arrangements. Keep temporary responses, completed work and verified correction distinct. Retain outstanding limitations and revisit recurring findings with the relevant people. Review inspection scope and intervals after changes instead of closing the report as soon as a task is assigned. A completed checklist is not automatic technical acceptance of every item photographed.
Common mistakes
- Using one interval regardless of changing risk.
- Calling every progress walk a complete required inspection.
- Assigning findings without checking their response.
- Using a photograph as technical acceptance.
Checklist
An inspection arrangement shows
- Actual areas, activities, shifts and additional requirements.
- Suitable interval and special-check triggers.
- Prepared participants and appropriate worker involvement.
- Located findings and immediate response where required.
- Verified follow-up and unresolved limitations.
Check your understanding
The weekly form is signed, but a new activity changes the risk between visits. Is the existing interval enough?