The OHS program the Regulation expects, by workforce size
A roofing company’s busy-season hiring will expand its workforce. The owner assumes last year’s small-operation meeting folder automatically remains the appropriate safety program for the expanded business.

Check the requirement before the workforce changes. WorkSafeBC describes a formal program for employers with 20 or more workers and at least one moderate- or high-hazard workplace, or with 50 or more workers. An officer can also require one. Smaller operations still need a less formal program with regular monthly worker meetings and records. Read the current Part 3 provisions and guidance for counting the actual workforce and determining the applicable program across the employer’s operations.
Compare the required program with actual delivery
- Establish the employer’s actual circumstances. Record the employer, current and anticipated workforce, work locations and applicable hazard information. Check the regulator’s current guidance when regular employment, seasonal changes or multiple workplaces make the count uncertain. Keep different employers’ responsibilities distinct on a shared site. A headcount on one morning, or the total attendance at a general contractor’s meeting, does not by itself answer this employer’s program question.
- Identify the applicable elements. Compare the received requirement with the company’s actual policy and responsibilities, inspections, written instructions, management review, investigations, records, instruction and supervision. These are the formal program elements summarized by WorkSafeBC. For a less formal program, check the required meetings and their records rather than assuming that smaller operations need nothing. Mark missing or uncertain arrangements clearly and refer legal application questions through the appropriate regulator or advisory route.
- Test an element in the field. Choose a current task and ask whether workers can obtain its needed instructions, report a concern and receive supervision. Follow an actual inspection finding to its response. Keep the observed evidence beside the program document so a complete binder cannot conceal an unusable arrangement. This is a practical review method, not a new prescribed audit format or a replacement for qualified evaluation of technical controls.
- Prepare for growth and maintain the program. Assign the missing work, receive the needed resources and review the arrangements against the planned workforce change. Keep what is merely proposed separate from what is implemented. Recheck after changed activities or sites and obtain help if the applicable requirement remains unresolved. Updating the cover page or buying a template is not evidence that the employer’s required program is functioning.
Common mistakes
- Assuming a smaller employer needs no program.
- Using one morning’s site attendance as the whole workforce count.
- Calling a purchased binder an implemented program.
- Waiting until after expansion to check the requirement.
Checklist
A program check records
- Actual employer operations and workforce.
- Current applicable requirement and resolved uncertainties.
- Required elements marked present, missing or unclear.
- Field evidence of delivery and received support.
- Review prompted by growth or changed operations.
Check your understanding
The folder contains a policy and monthly meeting notes. Does that establish the correct program for an expanding employer?