BC scaffolds: receive the configuration, technical data and checks
A hired crew finishes a scaffold at a church addition and hands over a green tag. The envelope foreman cannot locate the rated-load and erection information for its current configuration. Before workers and materials go up, the superintendent needs the supporting data and actual checks rather than a colour-based handover.

Part 13 keeps the employer responsible for scaffold safety and load capability regardless of the erector. It addresses available manufacturer or engineer data, platform construction, stability, connections and inspections. Read the applicable requirements for this configuration; a scaffold tag is not its design or inspection evidence. The guideline also explains why ordinary cross-bracing does not replace compliant guardrails.
Receive the configuration before accepting its use
- Identify what has actually been erected. Record the system, location, intended users, loading and proposed work. Compare the present arrangement with the referenced configuration rather than relying on an old delivery list. Identify uncertain components, attachments and supporting conditions for the responsible review. A scaffold photographed at one face of the building cannot establish that an extension or return has the same design and loading conditions.
- Receive the technical data and its scope. Obtain the relevant rated-load, erection and standards information from the proper source and make it usable where required. Check whether a variation needs the appropriate engineering instructions or certification. Keep the actual permitted configuration and limits visible to users. Do not combine convenient components or extend the load arrangement because they fit physically or have been used together elsewhere.
- Connect the installed condition to its criteria. Have the responsible people check support, stability, ties or securing, platforms, access and protection against the actual requirements. Identify electrical or surrounding-work questions through the appropriate specialist process. Record unresolved findings and restrictions. This lesson sets no universal tie spacing, timber grade substitute or engineering load test; an informal shake or a neat photograph cannot establish the required capacity.
- Maintain checks through changes and handovers. Establish the required pre-use and modification checks and the defect-response arrangement. Have proposed loading or configuration changes reviewed before they are adopted. Communicate limits and affected areas to actual recipients, including later shifts and trades. Keep removal, restoration and the next inspection connected. A tag left in place after an alteration cannot document what changed or who checked the resulting arrangement.
Common mistakes
- Accepting a colour without the configuration information.
- Mixing components because their connectors fit.
- Leaving load or support questions behind a generic note.
- Keeping the old status after an unreviewed alteration.
Checklist
A usable scaffold handover retains
- Actual system, location, work and proposed load.
- Applicable configuration and available technical data.
- Received supporting, stability, access and protection checks.
- Unresolved findings and communicated restrictions.
- Modification, reinstatement and subsequent inspection responsibilities.
Check your understanding
The scaffold has a current tag, but its loading platform was added later without a received review. Is the tag enough?