Got a minute? Clarify the consequence, answer time and responsible receiver
The electrical foreman stops the superintendent with 'Got a minute?' The superintendent is already walking to a scheduled receiving check. Saying yes could open an unbounded discussion; saying 'later' could miss a decision that genuinely affects today's work.

Clarify the request before committing to the whole conversation. Ask for its consequence, needed answer time and actual decision owner. Then arrange the appropriate response. A short triage can be useful, but thirty seconds is not a rule or a guarantee that every request can be safely classified that quickly. Unclear consequential matters need clarification, not a convenient dismissal.
Make the first exchange useful
- Ask what the request is about. Try 'What answer do you need, and what depends on it?' Obtain the location and enough context to identify the consequence. Keep the site's established emergency and safety response available. Do not assume a calm tone means the matter can wait, or demand a perfect written submission before responding to something requiring immediate attention.
- Establish the real answer time. Ask whether work is waiting, a decision window is closing or another person needs an input. Separate preference from the actual commitment. A crew can be working now while a supplier's booking still needs an answer earlier than your next round. Where consequences are unclear, investigate further rather than guessing urgency from who speaks loudest.
- Identify the responsible receiver. Check whether you can answer within your role or need another person's review. Make a referral received, with the question and needed time attached. Do not give informal technical or commercial permission to save a conversation. If the correct receiver is unavailable, use the applicable escalation route instead of telling the requester to keep trying names.
- Agree the response and close the exchange. Respond now, arrange a specific later conversation or make the needed referral. State what information to bring and what remains pending. Confirm that the requester understands the next step. If the issue grows during triage, reassess the response; a quick first exchange should organize the question, not conceal its complexity.
Common mistakes
- Saying later before understanding the consequence.
- Equating no stopped crew with no time-sensitive decision.
- Referring a person without the question or needed date.
- Giving unauthorized permission to keep the exchange short.
What to say
A short request-triage script
Check your understanding
Nobody is waiting on site, but a supplier decision closes before the next round. Can the request wait automatically?