Site security as logistics: fence, gates, lighting, access and the alarm response
A generator disappears from an infill site beside a park. Four trades have after-hours keys, but the lock-up list has no owner and the alarm contact is outdated. More fencing alone will not establish who enters or who responds.

Plan the perimeter, permitted access, credentials, monitoring and response as one reviewed system. Base it on actual site exposure, stored value and phase needs, then assign who updates it and responds to exceptions. Keep emergency and safe working access under the appropriate review. A second fence or camera can be a proposed measure; it does not guarantee theft prevention or authorize unrestricted surveillance.
Connect access to a response
- Review the current perimeter and exposure. Mark gates, laydown, temporary openings, lighting and changing occupied boundaries. Have the appropriate people assess proposed controls and any effect on emergency access, neighbouring property and safe work. Do not block a required route merely to improve the lock-up drawing.
- Control authorized access and credentials. Identify who approves access, its purpose and period, and how keys or cards are issued, returned and disabled. Keep the register in an approved restricted location. After-hours trades and deliveries need a confirmed access and site-working arrangement; a key does not by itself approve the activity.
- Review monitoring and privacy. Define the purpose, actual camera view, access to recordings and approved handling of information with the responsible advisers. Federal public-place video guidance excludes employee surveillance, and workplace rules vary. Assess the applicable law and people affected rather than using one public-camera checklist as permission to monitor every worker.
- Assign lock-up and alarm response. Name the person and backup for closing checks, approved alarm status and exceptions. Confirm current response contacts and their responsibilities. Use the established emergency or security process if a concern is found; do not send a lone foreman into a suspected intrusion because their number is first on the list.
Review the arrangement when the building starts locking, a trade leaves, the laydown moves or temporary access changes. Record new permissions and withdraw old ones through the approved process. Test the contact route without inventing response-time guarantees, and keep known gaps visible. Cost each proposed control against the actual reviewed need, rather than treating the last incident as a reason to add every available device.
Common mistakes
- Treating possession of a key as permission for any after-hours task.
- Adding cameras without reviewing purpose, affected people and access.
- Changing the secure boundary without checking emergency routes and credentials.
Checklist
Review the security setup
- Current perimeter, exposure and reviewed controls.
- Authorized access and credential register.
- Applicable monitoring and privacy review.
- Lock-up owner, backup and response contacts.
- Phase changes and outstanding gaps.
Check your understanding
The doors now lock. Can the old perimeter fence be removed?