Choosing a document platform for a small contractor: the questions before the demo
The contractor's owner likes the demonstration, but the foremen need to open the correct drawings without a reliable connection. The office needs usable records when a project closes. Both requirements should be written before the shortlist is judged on its most polished screen.

Write the document workflows and decision criteria before the demonstration, then test the shortlist against realistic field and office tasks. Include permissions, exports and the full quoted cost. Select from the evidence and unresolved gaps. A trial can expose practical problems, but its duration and participants should fit your work rather than an assumed one-month rule.
Test the requirements you actually need
- Describe the work and its users. List the documents and registers to control, who prepares and publishes them, and how field and external users obtain current information. Identify the locations and connection conditions to test. Separate essential requirements from conveniences. Use specific tasks, such as finding the authorized sheet and showing its issue identity, rather than asking whether the product is easy.
- Check supplier and information requirements. Ask about access controls, service support, data handling, storage locations, incident arrangements and retention or deletion terms where relevant. Bring unresolved security, privacy and contractual questions to the appropriate advisers. Public Canadian cyber guidance recommends considering supplier practices and cloud data responsibilities; a reassuring demo is not evidence that your particular information requirements are met.
- Run a proportionate controlled trial. Agree representative participants, tasks, test information and limits before using live sensitive records. Test actual offline retrieval and update behaviour where required, publication, external access and finding prior issues. Record what happened, including failed steps and help needed. Choose a period and workfront that can exercise the important conditions rather than declaring a small successful trial complete proof.
- Test leaving and compare the full cost. Obtain sample exports of relevant files, registers, relationships and metadata, and check whether they remain useful outside the platform. Review the quoted user, project, storage, setup, support and exit costs that apply. Record each essential requirement as demonstrated, unresolved or failed, and identify how the team will handle a gap before making the purchase decision.
Decide who will run publication and user administration after selection. Training and a workable responsibility arrangement belong in the comparison, because a platform cannot supply a missing project process. Keep the decision record and the test evidence so the next manager can understand both the chosen solution and its known limits.
Common mistakes
- Choosing before writing the essential field workflows.
- Testing exports only after the subscription ends.
- Treating a successful demonstration as a security or access review.
Checklist
Before choosing the platform
- Essential users, documents and tasks.
- Representative field conditions.
- Supplier, information and access questions.
- Trial results and unresolved requirements.
- Usable export evidence.
- Full quotation and administration plan.
Check your understanding
The foremen liked the trial. Is that enough to buy?