Coordinating with a project manager who is not on site: the superintendent's side
The project manager covers three jobs and usually visits on Thursday. By Wednesday the superintendent has nine open decisions at the maintenance-yard building. Photographs and tickets are scattered, and several questions need action before the visit.

Agree a daily summary, a dated decisions list and an urgent contact route with the project manager. Confirm what the superintendent may decide independently and keep supporting records easy to find. Use the site visit to review the remaining questions, not as the first time the manager hears them. Financial delegation does not automatically authorize a technical or safety change, and an urgent issue should not wait for the next scheduled update.
Give the manager a clear decision request from site
- Agree the routine and backup. Choose a practical update time and channel, with contact arrangements for urgent needs and absences. Confirm who responds when the manager is unavailable. A daily message can support normal planning but does not replace emergency, safety or required notice procedures.
- Summarize actual state concisely. Report what completed, what is blocked and which decision is needed. Locate the area and identify the next effect. Three headings are a useful discipline; do not force complex or serious information into three unexplained fragments.
- Keep dated requests with support. Give each open decision an owner, needed-by date and links to the relevant current records. Separate requests awaiting facts from those ready for approval. A photograph helps explain a condition, but its meaning and permitted use still need context.
- Confirm delegated limits. Record the actual purchasing, scope and other authority the company approves. Identify exclusions and cases requiring qualified review. Do not interpret a small-dollar site-account limit as permission to approve anything under that amount, alter a design or bypass a required instruction.
- Prepare and follow the visit. Send a focused agenda with current status beforehand. Use the visit for decisions that need direct review and assign unresolved ones afterward. Retain the actual outcome rather than marking every item closed because ninety minutes were spent discussing the list.
Common mistakes
- Saving urgent questions for the weekly visit.
- Sending photos without location or a decision request.
- Treating a purchasing limit as unrestricted field authority.
Checklist
The superintendent's decision routine
- Agreed update and urgent backup route.
- Actual done, blocked and needed status.
- Dated requests with current support.
- Verified authority and exclusions.
- Visit agenda sent early.
- Actual decisions and unresolved owners recorded.
Check your understanding
A request costs less than your purchasing limit but changes a drawn detail. Can you approve it alone?



